Category Archives: Design Preconstruction Services

Technical Demolition Case Studies: New Street Station & the A404M Railway Bridge

During my period of confinement, Coleman & Company had started work on the Prestigious Multi Million Pound Birmingham New Street Station Remodelling Scheme for Network Rail. This was a very difficult, demanding and technical demolition project. It required the removal … Continue reading

Posted in Civil Engineering, Complex Demolition, Demolition, Design Preconstruction Services, Health & Safety, Railway Projects, Specialist Cutting, Temporary Works | Leave a comment

Bigger Machines Required for more challenging High Reach and Tower Block Demolition Projects

In addition to the Cat350 and Hitachi 850 high reach machines, we decided to purchase a Super High Reach Demolition Machine. As with the other High Reach Machines we also purchased the excavator equipment. These were required for very high … Continue reading

Posted in Complex Demolition, Demolition, Design Preconstruction Services, High Rise Demolition, Uncategorized | Leave a comment

Specialist Machinery Required for High Reach and Tower Block Demolition.

Coleman & Company we were now very active in land reclamation, clearing sites, demolishing differing structures, demolishing high-rise blocks and preparing sites prepared for the more socially acceptable low rise buildings. This led us to purchase larger machines the first … Continue reading

Posted in Complex Demolition, Demolition, Design Preconstruction Services, High Rise Demolition, Hospital Demolition, Industrial Demolition, Specialist Cutting, Temporary Works | Leave a comment

Specialist Demolition Projects

National Grid had embarked on a national programme of clearing redundant Gas Holders. Mark had chased this opening, being successful with the contract to dismantle and remove two multi stage gas holders on a restricted site at Nechells, Birmingham. This … Continue reading

Posted in Civil Engineering, Complex Demolition, Demolition, Design Preconstruction Services, Facade Retention, Health & Safety, Specialist Cutting, Temporary Works | Leave a comment

Specialist Demolition in Glasgow

1, George Square, Glasgow was the home of the once famous General Post Office Headquarters, constructed in 1875, which was classed as the absolute central point of reference for the City`s postcode and mileage charts. The G1 building had been … Continue reading

Posted in Civil Engineering, Complex Demolition, Demolition, Design Preconstruction Services, Facade Retention, Health & Safety, Temporary Works | Leave a comment